Measurement 4 (QSB 2124) (Semester 4)

In Measurement 4, I have learned to produce measurement for external works, piling works and renovation and demolition works. The lecturer that guides me for this subject is Sr Chang Khong Thong. Measurement for external works includes sewerage reticulation, surface water drainage, roads and pavements and water reticulation. The assessment of the student overall performance comprise of one group assignment, Elemental Cost Analysis(ECA) workshop, one mid-term test and final examination. The total marks is 100%.

The coursework consists of three assignments. The first assignment is a group project consists of 5 members in a group to measure all elements in the task allocation provided by lecturer including Bills of Quantities and prepare a set of tender documents to calling for tender. The second assignment is a one hour mid-term test. The third assignment is an Elemental Cost Analysis(ECA) workshop. A group of 8 students prepare detail cost analysis of the selected building project to write down in ECA report.

This is a good preparation for the 6-months internship. I am able to apply all the theories into professional practice. Learn independently and manage myself, for example time management. Also, I learn to solve problem in practice to be self-reliant. Furthermore, I have experienced to present my tender documents that is assessed by several lecturers, one in ECA workshop and another one is for the first assignment. This allow me to practice on communication skills in various modes and settings.


No comments:

Post a Comment